The future queen of the Nordhavn fleet, the N120 motor yacht Aurora, is expected to be presented for the first time at the end of this year. As shown in the images, the building of the Aurora superyacht goes on at a steadfast pace.
Currently, craftsmen are installing the stone throughout the N120 luxury yacht Aurora’s interior while efforts on the exterior include stainless steel work and window installation. The hull is also being prepared for paint.
Next week, the 120 project’s manager, Trever Smith, will be at the South Coast Marine yard in Xiamen where the Nordhavn 120 superyacht Aurora is being constructed. He’ll be accompanied by the ownerand his electronics specialist to go over electronics set up and to assess layout of audio visual equipment.
Trever will later be joined by Nordhavn’s Chief of Design, Jeff Leishman, to survey the Aurora yacht’s progress. “We will be looking at everything together but basically Jeff wants to make sure he is completely satisfied with all the work done to this point before the last phase of construction commences,” said Trever.